PDF Print E-mail
ASHOK NANDAVANAM

Features

The overwhelming response for the township of Ashok Nandavanam Phase I and the happiness in fulfilling your basic dream of a peaceful and comfortable shelter has dragged us into this excellent project of Ashok Nandavanam Phase II.

Ashok Nandavanam phase II is a project  with  40 houses built to your taste as duplex and four in one semi independent duplex houses at an affordable price.

Welcome to Ashok Nandavanam Phase II.

Features :

1.7kms from Ayyappanthangal bus terminus.

1.3 Kms from Sri Ramachandra Medical College and Hospital

1.5kms from Saveetha Dental College and Hospital.

Very near to Kalakshetra Matriculation School



Specifications



Flooring

a)    Elegant vitrified tile of size 2’ *2’ for living, dining, bedrooms, and kitchen. The flooring in balconies, toilets & wash area will be laid with anti skid ceramic tiles.

Note : Size,  Color  and  brand  will  be of  our  choice depending  on  bulk  availability.

Wall Tiling

a)     Kitchen is designed to compliment the decor with ceramic wall tiles for 2 feet above the platform.

b)     Toilet to create a world of your own will have ceramic wall tiles for 7 feet height

Note : Size,   Color  and  brand  will  be of  our  choice depending  on  bulk  availability.

Kitchen Platform & Sink

a)     Kitchen platform of 2feet width polished granite of  20mm  thickness.

b)     Kitchens will have SS sink coupled with functional utility of design and aesthetics.

c)    R.C.C loft will be provided in kitchen.

Doors / Windows / Ventilators

a)     Main door frame made of Teak wood  with panelled shutters. Other doors will be of country wood frame and shutters.

b)     Toilet doors will be made of plywood with waterproof countrywood shutters.

c)     Windows will be of Country wood with glass and MS grill protection.

Painting Finishes

a) All walls except kitchen, service, balconies and toilets will be finished with putty and OBD.

b) Ceilings will be finished with cement paint.

c) External walls will be finished with Supercem.

d) Main door will be of melamine polish finish and all other doors , windows and grills will be of enamel paint.

e) Kitchen, service area and balcony inner area will be of cement paint.

Note: The color of the paint wherever not mentioned will be as per our choice.

Electrical

a)     Three-phase supply with concealed wiring will be provided. The actual supply will be single or three phase based on the TNEB rules and regulations at the time of energizing the complex.

b)     Separate meter will be provided for each flat in the main board located outside the flat at the place of our choice.

c)     Common meters will be provided for common services in the main board.

d)     A/C provision with electrification will be provided in the master bedroom and pipe connection for the second bedroom .

e)     15A plug points will be provided for Fridge, Washing machine and geyser(two bathrooms) in toilets.

f)   All electricals will be of ISI brand only.

Plumbing & Sanitary

a)     All toilets  will be provided with  EWC

b)     Pedestal washbasin of color matching to tile in the master  bed room toilet

c)     Dining will be provided with washbasin without counter.

d)     Chromium plated fittings of the type metro or equivalent will be provided in Toilets.

Common Amenities

a)     An overhead tank of required capacity will be provided for bore well .

b)     Deep bore wells will be provided. The depth will be decided by us based on the yield.

c)      Car parks will be provided at extra cost with Granolithic flooring.



Availability


some more text here

Payment Terms

Down payment at the time of booking                      -   Rs.1,00,000/-

At the time of agreement (with in 15 days)               -  15%   minus already paid.

At the time of registration of land (within 45days)      -  35% +Registration

charges

At foundation stage                                                -  10%

On completion of Ground floor  roof slab                   -  10%

On completion of First floor  roof slab                       - 10%

On completion of internal plastering                         - 10%

Laying of flooring/electrical/plumbing                        -  5%

Before handing over.                                               -  5%

Extra Charges :

Registration charges and stamp duty.

Legal fees, documentation charges and incidental expenses (if any.)

Taxes as applicable (VAT, Service Tax)